Finding the right dust extraction hood is critical for UAE businesses. Whether in metalworking, construction, woodworking, automotive, pharmaceutical, or food processing, these systems protect your workforce and ensure compliance with Dubai Municipality, Abu Dhabi OSHAD, and federal safety standards. Non-compliance results in fines ranging from AED 1,000 to AED 200,000 plus facility shutdowns.
A dust extraction hood captures and removes airborne contaminants at the source—protecting workers from hazardous dust, welding fumes, grinding debris, and toxic vapors. In UAE's industrial sector, these systems are now mandatory equipment.
Airflow Capacity (m³/h)
UAE Note: Summer temperatures exceeding 45°C require 20-30% higher capacity.
Filtration Efficiency
Materials
Other Specifications
Select suppliers offering local service centers, 24-hour emergency response, Arabic/English support, spare parts inventory, site surveys, custom design experience, 12-24 month warranties, and maintenance contracts. Compare total cost of ownership—premium EC motors save 30-40% on electricity beyond initial investment.
Delivery Timeline: Standard products 1-2 weeks; custom systems 4-8 weeks; installation 1-5 days; commissioning 1-2 days.
Install motors with H-class insulation, control panels in air-conditioned rooms, and heat-resistant ducting. Choose stainless steel or galvanized components for coastal areas. Install pre-filters to protect systems from sand ingress.
Maintenance Schedule
Schedule major maintenance during cooler months (November-March).
What's the difference between dust extraction hood and regular exhaust fan?
Dust extraction hoods are engineered systems with specific capture velocities, filtration stages, and contaminant-specific designs. Regular exhaust fans simply move air without capturing particles efficiently or protecting workers at the source. Extraction hoods must meet industrial hygiene standards, exhaust fans don't.
Can I use one large extraction system for multiple workstations?
Yes, with proper ducting design. Central extraction systems serving multiple hoods are common in larger UAE facilities. Each hood requires specific airflow, calculated based on distance from the fan, duct size, and contaminant type. Hire a qualified MEP engineer for multi-station designs to ensure balanced airflow.
Do I need a permit to install industrial dust extraction in Dubai?
For large systems, yes. Dubai Municipality requires: MEP drawings approval for new installations, Civil Defence NOC for certain applications (especially those handling combustible dust), and a Building permit for structural modifications. Consult with your supplier—many offer permit processing services.
How often should filters be replaced in UAE's dusty environment?
More frequently than European/North American guidelines suggest. UAE suppliers typically recommend: Pre-filters every 1-2 months (vs. 3-6 months in temperate climates), Main filters every 3-6 months (vs. 6-12 months internationally), and HEPA filters annually (vs. 2 years in cleaner environments). Monitor pressure differential gauges—replace when ΔP exceeds manufacturer specifications.
Can extraction hoods work with air conditioning in UAE workshops?
Absolutely, in fact they should. Modern recirculating extraction systems with HEPA filtration return clean, conditioned air to the workspace. This is crucial for UAE facilities where exhaust air means losing expensive cooling. Ensure your system is designed for recirculation if AC is present.
What happens if I don't install proper dust extraction?
Consequences in UAE include: OSHAD or Municipality fines and penalties, Workplace injury claims and compensation costs, Insurance premium increases, Production shutdowns during inspections, Difficulty renewing trade licenses, and Liability for long-term employee health issues.
Are there financing options for dust extraction equipment in UAE?
Yes, many suppliers work with: Equipment financing companies (lease-to-own), Bank business loans, Free zone authority programs for SMEs, and Trade credit terms (30-90 days typical). Ask your supplier about available options during quotation.
How do I maintain warranty validity in UAE's climate?
Follow manufacturer maintenance schedules strictly. Key requirements: Use original replacement filters, Keep detailed maintenance logs, Conduct servicing by certified technicians, Don't modify system without supplier approval, and Report issues immediately rather than attempting DIY repairs.
Can I relocate the dust extraction hood to a new facility?
Generally, yes, but consider: Professional disassembly and reinstallation required, Ducting may need replacement, Recertification and inspections in new location, and Warranty implications (check with supplier). Many UAE businesses upgrading facilities successfully relocate extraction systems with supplier support.
What's the lead time for custom-designed extraction hoods in UAE?
Typical timeline: Site survey: 1-3 days, Engineering and quotation: 5-10 days, Client approval: Variable, Fabrication: 3-6 weeks, Delivery and installation: 1-2 weeks, Testing and commissioning: 2-5 days. Total: 2-3 months for complex projects. Rush orders possible with premium pricing.